FA875125B0002 — Install steam boilers in buildings 2 and 3 at AFRL, rome, NY. The contractor will furnish all labor, equipment, devices, and materials to complete the installation in accordance with the technical specifications and drawings for each building. Includes general construction, fire protection, plumbing... | Celestix | Celestix AI
Install steam boilers in buildings 2 and 3 at AFRL, rome, NY. The contractor will furnish all labor, equipment, devices, and materials to complete the installation in accordance with the technical specifications and drawings for each building. Includes general construction, fire protection, plumbing...
Air Force Research Laboratory·Rome, NY·Jul 2025 — Dec 2026
$7.1M
Total Obligated
AWARDED236220Small Business Set Aside - Total (SBA)Fixed PriceSmall Business
Single Signal1 signal
0 modifications·3 bidders
Signal Analysis
Click any signal to see the evidence
8 other signals analyzed — no deviations detected
Financial Summary
$7.1M
Total Obligated
$7.1M
Current Value
$7.1M
Potential Value
Timeline
Jul 2025
Award Date
Dec 2026
Completion Date
545 days
Duration
FY2025
Fiscal Year
Competition
3
Bidders
Full And Open Competition After Exclusion Of Sources
Sealed Bid · Small Business
Contracting Details
Awarding AgencyAir Force Research Laboratory
Awarding OfficeFA8751 FA8751 AFRL RIKO
Funding OfficeF4HBC1
NAICS236220 — Commercial and Institutional Building Construction
PSCY1NB — Construction Of Heating And Cooling Plants