36C26325B0025 — Perform site preparation for SPS equipment by providing all labor, materials, and equipment to complete work per contract documents. Includes demolition of exterior site elements such as portions of retaining walls, sidewalks, concrete ramps, and chain link fences; preparation of the site for a conc... | Celestix | Celestix AI