W912PL13D0050-0002 — Maintain chiller B1600, Edwards Air Force Base, CA the contractor shall provide all supervision, labor, equipment and material to demo and replace 50 ton chiller and modify the controls that is already in place. The specific required work includes but may not be limited to the following: 1. Demo (1) existing 50 ton chiller 2. Provide/install ...show moreMaintain chiller B1600, Edwards Air Force Base, CA the contractor shall provide all supervision, labor, equipment and material to demo and replace 50 ton chiller and modify the controls that is already in place. The specific required work includes but may not be limited to the following: 1. Demo (1) existing 50 ton chiller 2. Provide/install (1) 50 ton chiller 3. The contractor provide/ install/modify energy management control system/direct digital to tie into the new chiller 4. The contractor shall provide/install/modify the electrical distribution as required by nec and manufacturer S recommendation for all the new chiller and pumps. 5. The contractor will modify the existing chiller foundations as required to allow for vibration isolation 6. Provide a 1 year extended warranty on chiller 7. Provide a 1 year extended warranty on the control system | Celestix | Celestix AI