W912PL12D0035-0002 — Statement of work repair perimeter fencing ph II&III, plant 42 palmdale, CA the contractor shall provide all labor, equipment and materials necessary to demolish the existing fencing and install new 8' high chain link fence fencing at locations indicated on the drawings and layouts for ph II&III at Air Force plant, palmdale, CA. Contractor shall ...show moreStatement of work repair perimeter fencing ph II&III, plant 42 palmdale, CA the contractor shall provide all labor, equipment and materials necessary to demolish the existing fencing and install new 8' high chain link fence fencing at locations indicated on the drawings and layouts for ph II&III at Air Force plant, palmdale, CA. Contractor shall verify field conditions. The performance period is one hundred fifty ( 50) calendar days from the time the contractor receives the formal notice to proceed. Davis bacon wage determination is CA130033 for California Los Angeles county effective upon award. Liquidated damages are calculated at $1,350.00 per day. | Celestix | Celestix AI