W912DR23C0015 — Renovation of nolan building phase 4 at Fort Belvoir, Virginia. Includes comprehensive renovation and repair of the existing building, addressing systems such as roofing, HVAC, electrical distribution, water distribution, wastewater collection, fire alarm and suppression systems, ceilings, windows and doors, floor coverings, interior partitions, ...show moreRenovation of nolan building phase 4 at Fort Belvoir, Virginia. Includes comprehensive renovation and repair of the existing building, addressing systems such as roofing, HVAC, electrical distribution, water distribution, wastewater collection, fire alarm and suppression systems, ceilings, windows and doors, floor coverings, interior partitions, and both interior and exterior finishes. The project also involves abatement of Asbestos-Containing Materials (ACM) and other hazardous materials (HAZMAT), as well as work on cast-in-place concrete, electrical, landscaping, drywall, acoustics, rough carpentry, security guard services, toilet accessories and compartments, wall and door protection, lockers, sprinkler systems, painting, stone, elevators, structural metal framing, mechanical equipment, unit masonry, resilient flooring and tiling, air barriers and waterproofing, folding partitions, demolition, fireproofing, entrances and storefronts, metal panels, raised access flooring, window shades, pedestrian control equipment, temporary fencing and gates, temporary asphalt paving, concrete strengthening, signage, and loading dock levelers and overhead doors. | Celestix | Celestix AI