VA69D12C0048 — Scope of work / steam tunnel upgrades and bypass to the 130 buildings. The contractor shall provide all equipment, labor, supervision, management, transportation, supplies and materials to complete steam tunnel upgrades and bypass to the 130 buildings at the federal health care center. All work as per scope and specifications. Locations as per ...show moreScope of work / steam tunnel upgrades and bypass to the 130 buildings. The contractor shall provide all equipment, labor, supervision, management, transportation, supplies and materials to complete steam tunnel upgrades and bypass to the 130 buildings at the federal health care center. All work as per scope and specifications. Locations as per drawings and shown during the walk through. | Celestix | Celestix AI