VA243RA0595 — Tas::36 0158 000::tas construction shall include but not be limited to: 1) providing and installing new automatic transfer switches as shown on contract drawing, 2) providing and installing new electrical feeders and raceway (CONDUITS) as shown the plan, 3) providing and installing new electrical panels and the associated circuit breakers as shown ...show moreTas::36 0158 000::tas construction shall include but not be limited to: 1) providing and installing new automatic transfer switches as shown on contract drawing, 2) providing and installing new electrical feeders and raceway (CONDUITS) as shown the plan, 3) providing and installing new electrical panels and the associated circuit breakers as shown on the plan, 4) removal of certain existing electrical equipment and material as shown on contract drawings, and 5) provide drawings (shop, working, as-builts, etc.) as detailed in contract documents. All shutdown shall be done after HR (AFTER 7PM) and on the weekends only. Coordinate all shutdowns work with the project engineer. | Celestix | Celestix AI