VA243C0791 — The contractor will furnish all materials, equipment, supervision, and personnel necessary to accomplish the job for removal and installation of the new HVAC systems and associated components on the new concrete pads as shown on the drawings and perform work specified herein and comply with VA specifications and VA regulations, procedures and ...show moreThe contractor will furnish all materials, equipment, supervision, and personnel necessary to accomplish the job for removal and installation of the new HVAC systems and associated components on the new concrete pads as shown on the drawings and perform work specified herein and comply with VA specifications and VA regulations, procedures and conditions for work at the medical center and any applicable codes as per requirements of all governing agencies. Work shall include selective demolition and modifications of existing walls, ceilings, ductwork, registers, etc. Debris disposal, all new work: ducts, ceiling systems, wall finishing, fire sprinkler and alarm work, electrical work, operational and final system testing and balancing and other related and ancillary work. Contractor will be responsible to coordinate and schedule work to minimize duration and shall be expected to plan work typically during duty hours of the hospital other than utility ties ins during off duty hours. Construction phasing will be required to ensure that HVAC system equipment, associated components; fabricated ductwork is stored on site at the time of shutdown of the spd department operations and timely manner to complete construction for re-activation of operations. Maintain all access to and egress from the buildings at all times for facility S fire protection requirements and to meet the requirements of regulatory codes, laws, etc. | Celestix | Celestix AI