The contractor shall provide all labor, materials, equipment, and other incidental work required to complete the exterior painting of 6 units one story officer family housing, garages, including entries, patios, walkways, porches, air cooled handling unit accu enclosures, trash enclosures, flag circle housing entry signage, guard shack, portable ...show moreThe contractor shall provide all labor, materials, equipment, and other incidental work required to complete the exterior painting of 6 units one story officer family housing, garages, including entries, patios, walkways, porches, air cooled handling unit accu enclosures, trash enclosures, flag circle housing entry signage, guard shack, portable toilet enclosure, security control cabinet, electrical controller box, siren and switchgear screen wall enclosure exterior side and all other work in accordance with the statement of work for won 1387516 dated 04 april 2016 and vls general engineering contractors proposal dated 29 april 2016.the performance period is 120 calendar days commencing on the date of award up to and including 22 september 2016.
NAVFAC Marianas
No anomaly signals triggered on this contract.
Number of Bidders: Not reported
Extent Competed: Not reported
Solicitation Procedures: Not reported
Business Size: Not reported
No modifications recorded.