Project title: road repair - susie peak road, belle fourche reservoir, belle fourche unit, South Dakota the work includes the following: toe drain installation along susie peak road at sta. 40+50, 91+00, and 109+50. 1. Remove and store gravel surface. 2. Excavating 420 ft of pipe trench across and along both sides of susie peak ...show moreProject title: road repair - susie peak road, belle fourche reservoir, belle fourche unit, South Dakota the work includes the following: toe drain installation along susie peak road at sta. 40+50, 91+00, and 109+50. 1. Remove and store gravel surface. 2. Excavating 420 ft of pipe trench across and along both sides of susie peak road. 3. Installation of drainage fabric wrap in trench around drainage material and pipe. 4. Placing 40 cyd of drainage material around pipe. 5. Installing 300 ft of double walled, perforated, corrugated hdpe pipe. 6. Install 180 ft of double walled, corrugated hdpe pipe. 7. Compact and fill 420 ft long pipe trench. 8. Repair and gravel road embankment disturbed by excavation. 9. Shape crown of road in areas repaired and graveled. 10. Place salvage soil at the ditches and other disturbed areas. 11. Reform any ditches disturbed by work.
USBR Missouri Basin and Arkansas-Rio Grande-Texas Gulf Regions
No anomaly signals triggered on this contract.
Number of Bidders: Not reported
Extent Competed: Not reported
Solicitation Procedures: Not reported
Business Size: Not reported
No modifications recorded.