GS08P13VLP0011 — Provide all necessary labor and materials to install (3) new 120 volt isolated ground outlets, (1) new 120 volt convenience outlet, install (3) cat 6 (BLUE) cables, RJ45 jacks and faceplates and install (1) new analog phone line for SSA odar at the federal building, 200 4TH st SW, huron, South Dakota. | Celestix | Celestix AI