GS05P13SIP0124 — Contractor shall provide all labor, materials and supervision to replace the display module on the trane chiller at 11 W. Quincy court, chicago, IL. It is an existing piece of equipment, and during startup trane determined that a piece not identified to be replaced required replacement. | Celestix | Celestix AI
Contractor shall provide all labor, materials and supervision to replace the display module on the trane chiller at 11 W. Quincy court, chicago, IL. It is an existing piece of equipment, and during startup trane determined that a piece not identified to be replaced required replacement.