GS05P07SIP0009 — High pressure cleaning of all high rise air handler re-heat coils. Work to also include inspection and adjustment of all high rise dampers, interior and perimeter coils to meet building design. All work necessary to meet leed certification for the 33RD and 36TH floor renovation. Additionally, air balance report requires minimum fresh air to ...show moreHigh pressure cleaning of all high rise air handler re-heat coils. Work to also include inspection and adjustment of all high rise dampers, interior and perimeter coils to meet building design. All work necessary to meet leed certification for the 33RD and 36TH floor renovation. Additionally, air balance report requires minimum fresh air to building. Repair work on high rise air distribution system not performed by previous O&M contractor (urban/meridan, contractor end date 05/31/2006). Cost of all work is proposed as deduction from O&M contract, in the john C. Kluczynski federal building, 230 S. Dearborn street, chicago, IL. | Celestix | Celestix AI