FA500021D0002-FA500024F0102 — The contractor shall furnish all design, parts, labor, equipment, supplies, materials, appliances, transportation and perform all work (including work of an incidental nature), for fxsb 24-2107 construct parking lot B6136 fxsb 24-2107, jber, IAW SOW. Includes hauling, sweeping, and concrete tasks as part of the construction activities. | Celestix | Celestix AI
The contractor shall furnish all design, parts, labor, equipment, supplies, materials, appliances, transportation and perform all work (including work of an incidental nature), for fxsb 24-2107 construct parking lot B6136 fxsb 24-2107, jber, IAW SOW. Includes hauling, sweeping, and concrete tasks as part of the construction activities.
AWARDEDNAICS 236220
U.S. Air Forces Europe and Africa
N/A obligatedStart: Sep 2024End: Sep 2030
Anomaly Analysis
Single Signal — common procurement pattern
Temperature
WARM
Signals Triggered
1 signal
Modifications
0
Signal Breakdown
Duration Anomaly
Contract spans 6 years — unusually long for construction
8 other signals: not triggered
This contract triggered 1 anomaly signal. Contract spans 6 years — unusually long for construction. awarded by U.S. Air Forces Europe and Africa.