FA480021D0001 — CONTRACTOR SHALL REMOVE AND REPLACE APPROXIMATELY 128 OVERSIZED CONCRETE SLABS LOCATED ON THE F-22 FIGHTER RAMP THAT ARE DETERIORATED AND SPALLED OR CRACKED. PERIOD OF PERFORMANCE IS 272 CALENDAR DAYS. | Celestix | Celestix AI