FA480018D0003 — MUHJ 22-4004 REPAIR FAILING HVAC 1MXS FACILITY 361. DESIGN BUILD EFFORT TO COMPLETELY REPAIR THE HVAC SYSTEM AT FACILITY 361. THE CONTRACTOR WILL BE RESPONSIBLE FOR BRING THE PROVIDED 35% DESIGN TO COMPLETION AND PERFORMING THE CONSTRUCTION. | Celestix | Celestix AI