FA480021D0001 — THE CONTRACTOR SHALL PROVIDE ALL LABOR, MATERIAL, AND EQUIPMENT TO REMOVE APPROXIMATELY 8,000 SF OF 6 INCH CONCRETE ON THE SE SIDE OF F. 775. THE CONTRACTOR SHALL ADD SUB BASE AS NEEDED TO MEET MINIMUM REQUIREMENTS AS APPLICABLE TO UFC 3-250-01. | Celestix | Celestix AI