75H70125C00013 — PIMC mechanical project 1 - heating, ventilation, & air condition (project # PH23PH04H6): the project consists of alteration (LEVEL 2) of the HVAC system for the pediatric clinic (building 12) and the dental clinic (building 239) at the Phoenix Indian Medical Center (PIMC). Additional work includes replacement of 18 cooling tower valves, an ...show morePIMC mechanical project 1 - heating, ventilation, & air condition (project # PH23PH04H6): the project consists of alteration (LEVEL 2) of the HVAC system for the pediatric clinic (building 12) and the dental clinic (building 239) at the Phoenix Indian Medical Center (PIMC). Additional work includes replacement of 18 cooling tower valves, an autofill diesel system, a heat exchanger, and a medical air system at the central plant (building 234), installation of a dust collection system and a new parking canopy, and above-ceiling work in the main hospital's 3RD floor isolation rooms (building 233) to replace ductwork and adjust ceiling grids and lighting. Infection control mitigation measures are required for all HVAC and isolation room work. | Celestix | Celestix AI