San juan, Puerto Rico ATCT hurricane maria repairs. Includes repairing and replacing damaged interior finishes, replacing exterior architectural metal panels and flashing, repairing cracks in exterior precast concrete panels, resealing exterior joints, painting exterior ATCT precast concrete, replacing exterior chiller pipe jacketing, repairing ...show moreSan juan, Puerto Rico ATCT hurricane maria repairs. Includes repairing and replacing damaged interior finishes, replacing exterior architectural metal panels and flashing, repairing cracks in exterior precast concrete panels, resealing exterior joints, painting exterior ATCT precast concrete, replacing exterior chiller pipe jacketing, repairing large concrete cracks in architectural fins, installing carbon fiber-epoxy laminates, cleaning and resealing the concrete cab catwalk surface, and repairing or replacing fireproofing in structural steel at the Air Traffic Control Tower (ATCT) at luis muñoz marin international airport. All work is performed in accordance with specifications and drawings, at a critical facility that must remain operational 24/7, and requires significant work at above-ground heights, including the use of a suspended scaffold system, without disrupting air traffic operations.
Southwestern Region
No anomaly signals triggered on this contract.
Number of Bidders: Not reported
Extent Competed: Not reported
Solicitation Procedures: Not reported
Business Size: Not reported
No modifications recorded.