693C7318C000048 — The project consists of the rehabilitation and reconstruction of numerous storm damaged roadways within the chequamegon-nicolet national forest. The work includes earthwork, roadway excavation and reconditioning, aggregate resurfacing, asphalt pavement removal with separation-stabilization geotextile and aggregate base replacement, asphalt concrete ...show moreThe project consists of the rehabilitation and reconstruction of numerous storm damaged roadways within the chequamegon-nicolet national forest. The work includes earthwork, roadway excavation and reconditioning, aggregate resurfacing, asphalt pavement removal with separation-stabilization geotextile and aggregate base replacement, asphalt concrete pavement overlay, drainage improvements and replacements, riprap installation, and other miscellaneous work. | Celestix | Celestix AI