36C77625C0008 — EHRM infrastructure upgrade at the ann arbor VA medical center involves furnishing all labor, tools, material, equipment, and supervision to prepare the site for building operations, including demolition and removal of existing structures. Includes selective demolition, general construction, and alterations as required by project drawings and ...show moreEHRM infrastructure upgrade at the ann arbor VA medical center involves furnishing all labor, tools, material, equipment, and supervision to prepare the site for building operations, including demolition and removal of existing structures. Includes selective demolition, general construction, and alterations as required by project drawings and specifications. Tasks encompass architectural modifications, installation and upgrades to fire protection, plumbing, mechanical, electrical, and telecommunication systems. | Celestix | Celestix AI