36C77623C0113 — The contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the EHRM infrastructure upgrades hines IL construction project consistent with specs and drawings. Includes complete site preparation for building operations, demolition and removal of ...show moreThe contractor shall provide all tools, equipment, materials, labor, supervision, personnel, and shall do all things necessary that will result in the completion of the EHRM infrastructure upgrades hines IL construction project consistent with specs and drawings. Includes complete site preparation for building operations, demolition and removal of existing structures, installation of redundant fiber loops, construction of new telecom rooms, new telecom equipment rooms, new UPS rooms, renovation of the server room, and pulling of new data cabling on the hines campus. Additional tasks involve infrastructure upgrades and renovation of existing spaces, including electrical, bonding, UPS, building management system interfaces, HVAC, communication, physical security upgrades, and fiber infrastructure backbone campus-wide within and between buildings 1, 2, 3, 4, 7, 8, 9, 12, 13, 16, 17, 18, 20, 33, 45, 48, 100, 113, 128, 200, 205, 217, 220, and the joliet cboc, as well as associated work in other buildings as indicated. | Celestix | Celestix AI