36C25218C0196 — Contractor shall provide all labor, materials, equipment, supervision, and all other resources necessary to construct per plans and specifications project 550-15-107, remediate legionella station-wide PHASE-1. The scope of this project is to replace the domestic water distribution system in building 58 and to install a continuous water monitoring ...show moreContractor shall provide all labor, materials, equipment, supervision, and all other resources necessary to construct per plans and specifications project 550-15-107, remediate legionella station-wide PHASE-1. The scope of this project is to replace the domestic water distribution system in building 58 and to install a continuous water monitoring system in buildings 39, 58, 101, 103, 128, 129, 130 and 131. | Celestix | Celestix AI