36C24824C0012 — Expand electrical distribution. The project includes demolition and replacement of electrical switchgears, transformers, generators, and automatic transfer switches, as well as installation of National Electrical Code (NEC) required three emergency circuits (life safety, equipment, and critical) at the lake city VA medical center in lake city, FL. | Celestix | Celestix AI