36C24418C0158 — Renovate or suites construction project. Includes installing overflow pipes for the humidifiers, relocating fire sprinkler and drain pipes, and removing stainless steel cabinets in the anesthesia work room. | Celestix | Celestix AI
Renovate or suites construction project. Includes installing overflow pipes for the humidifiers, relocating fire sprinkler and drain pipes, and removing stainless steel cabinets in the anesthesia work room.
AWARDEDNAICS 236220
VISN 4
N/A obligatedStart: Jun 2018End: Mar 2026
Anomaly Analysis
Single Signal — common procurement pattern
Temperature
WARM
Signals Triggered
1 signal
Modifications
0
Signal Breakdown
Duration Anomaly
Contract spans 8 years — unusually long for construction
8 other signals: not triggered
This contract triggered 1 anomaly signal. Contract spans 8 years — unusually long for construction. awarded by VISN 4.