36C24224C0144 — Upgrade elevators at brooklyn. The contractor will upgrade existing elevators in building #1 (P6, S5, S9, S10, and S11) and provide new flood protection systems, gibbs, guardrails, controllers and drives, selectors, wire ways, conductors, traveling cables, hoist machines, hoist ropes, stopping devices, car operating devices, limit switches, car ...show moreUpgrade elevators at brooklyn. The contractor will upgrade existing elevators in building #1 (P6, S5, S9, S10, and S11) and provide new flood protection systems, gibbs, guardrails, controllers and drives, selectors, wire ways, conductors, traveling cables, hoist machines, hoist ropes, stopping devices, car operating devices, limit switches, car leveling devices, emergency stop switches, hall position indicators, operating panels, position indicators, hall push buttons, hoist way doors, hoist way door panels, car doors, door operators, top of car operating stations, new or refurbished elevator cabs, ada compliant elevator car intercom/communication systems, security cameras, pit switches, and disconnect switches. The project includes installation of smoke detectors, heat detectors, sprinklers, and shunt trip breakers to comply with the latest nfpa codes for fire service operation and elevator recall, as well as hazardous materials abatement prior to demolition, and minimizing landfill waste through salvage, recycling, or reuse. Additional work includes upgrading flood protection and security cameras on 20 elevators in building #1 and building #15 (excluding modernization of opc P1, opc P2, opc P3, and opc S1 in building #15), with all work performed at the VA New York harbor healthcare system brooklyn campus. | Celestix | Celestix AI