12405B20C0003 — The contractor shall provide all labor, supervision, tools, equipment, and materials necessary to remove and replace (9) original wadsworth VC100 roof vent drive motor gear boxes, to include removing existing rack and pinion assemblies and replacin | Celestix | Celestix AI
The contractor shall provide all labor, supervision, tools, equipment, and materials necessary to remove and replace (9) original wadsworth VC100 roof vent drive motor gear boxes, to include removing existing rack and pinion assemblies and replacin
AWARDEDNAICS 236220
ARS Southeast Area
N/A obligatedStart: Mar 2020End: Jun 2020
Anomaly Analysis
Temperature
COOL
Signals Triggered
0 signals
Modifications
0
Signal Breakdown
No anomaly signals triggered on this contract.
No anomaly signals detected on this contract.
Competitive Landscape
Number of Bidders: Not reported
Extent Competed: Not reported
Solicitation Procedures: Not reported
Business Size: Not reported
Modification History
No modifications recorded.
Awarded To
Couvillon & Associates Marrero
UEI: STVCJNQKVBC3Partnership or Limited Liability Partnership